Chez Sinexcel, nous sommes experts dans l'installation de bornes de recharge pour véhicules électriques dans de nombreux environnements différents en Chine. Nous pouvons installer des bornes de recharge muraux, monté à l’arrière et des bornes de staionnement dans la rue. Dont le soutien logistique et le soutien des systèmes de paiement. En plus, les bornes de recharge dans les garages, les hangars et les allées, peuvent intégrer à des système solaires photovoltaïques ou à des systèmes de stockage d'énergie, les gens peuvent recharger les véhicules électriques à travers l'énergie renouvelable.
Public Transport Charging Station, Lankao County, Henan Province
Project Address: Huanghe Road, Lankao County
station configuration:
360 kW group charging split stack equipped with 10 connectors 1 pcs for even charge.
360 kW group charging split stack equipped with 12 connectors 5 pcs for even charge.
250 A 2 connector outdoor split terminal 35 pcs for even charge and double charge.
60 kW 2 connector integrated fast and slow DC charger 16 pcs.
A total of 102 connectors, can charge 102 cars at the same time.
programme narrative:
Features :
360 kW charging split stack, maximum supports for 12 connectors output, and any connector has the maximum output power 360 kW;
All modules can be placed in any connector; A maximum current of 250 A for any one connector;
A maximum output power 180 kW for any two connectors used at the same time.
Each one of the three connectors separated by 3 connectors can output 120 kW power simultaneously.
Each one of the six connectors separated by one connector can output 30 kW power simultaneously.
Application case analysis :
360 kW charging split stack "one brings more" intelligent group charging, charging power intelligent allocation, high utilization rate of chargers, parking space full cover, one car one charge, at night meeting all vehicles (low price) charging in period of low electricity usage, night charging without manual operation; The charger adopts one bringing multi-automatic switching and power sharing scheme; The charging split stack can offer the constant power output in the range of 330V-750V to 12 electric vehicles at the same time. Each connector output 60 kW and the output current of each connector can reach 180 A, to meet the demand of fast power supply during the day and full of charge at night.
Guangzhou Xintang Charging Station
project address: Guangzhou Poly Dongjiang Capital (Zengcheng District Xintang Jiangfu Avenue 2)
station configuration:
180 kW 2 connector fast and slow charging integrated DC charger 13 pcs.
150 kW 2 connector fast and slow charging integrated DC charger 17 pcs.
A total of 60 connectors, can charge 60 cars at the same time.
programme narrative:
Features:
single connector charge maximum full power output, maximum charge current 250 A. double connectors charge equal power output to two cars or double connectors charge full power output to one car at the same time;
Fast and slow charge, reserve charge, double charge. according to actual needs, choose charging strategy. At night simultaneously slow charge, at day line up fast charge, to meet the actual users’needs;
The application case analysis: a double connectors 150 kW/180kW charger system, can charge the A car / B car with one connector full power; can also charge the A、B cars at the same time with 75 kW/90kW each connector; can also charge a car with high current with 2 connectors full power(double charge) to shorten charging time.
Charging Station in Huizhou South Railway Station
project address: Huizhou South Station Huida Lianjiexian
station configuration:
120 kW outdoor 2 connector group charging integrated DC charger 32 pcs.
A total of 64 connectors can charge 64 cars at the same time.
programme narrative:
Technical features:
group charging DC charger is to take module 30 kW as the regulating unit in the charger, according to requirement of BMS where a connector connect, the charger automatically activates modules to make the connector output demanding power, The remaining charging modules receive the BMS instruction passed by the other connector to adjust the output power. According to the actual needs, select charging strategy.
The application case analysis:
a set of 120 kW double connector charger, the A connector can output the maximum power of 120 kW. At that time the B connector is used, the charger automaticaLly releases 30 kW power to the B car. After the A car is full, the system automatically gives all the power to the B car, the power regulation unit is 30 kW rated output power;
Vous souhaitez obtenir des informations sur Sinexcel? Nous apprécions votre intérêt et serions heureux de vous conseiller.
Donnez-nous simplement quelques informations afin que nous puissions vous contacter
Charges vary depending on service provider and country/region
Free of charge from German landlines and mobile networks; callers from abroad,
please use the international number
* Sinexcel responsable de vos données personnelles. notre avis de confidentialité décrit les différents droits de protection des données dont vous disposez et la... Sinexcel responsable de vos données personnelles. notre avis de confidentialité décrit les différents droits de protection des données dont vous disposez et la manière dont vous pouvez exercer ces droits en ce qui concerne toute information que nous traitons de votre part, comme le droit d'accéder ou de recevoir une copie de vos informations ou de demander la suppression ou la correction de votre informations. Dans certains cas, vous pouvez vous opposer au traitement ultérieur de vos informations et, lorsque Sinexcel a demandé votre consentement pour traiter les informations, vous pouvez retirer ce consentement à tout moment.
Pour plus de détails sur la façon dont nous utilisons les données personnelles et sur les droits de confidentialité des données, veuillez consulter notre avis de confidentialité complet.
See more